首页Home / 防腐耐磨产线Coatings Line

防腐耐磨产线Anti-Wear & Anti-Corrosion

从涂层材料到防腐工程:烟囱、脱硫塔、储罐、管道与钢结构——勘察、方案、材料、施工、巡检一体化,让设施多服役十年。

Materials to turnkey works: chimneys, FGD towers, tanks, pipelines and steel structures — survey, design, materials, application and aftercare, adding a decade of life.

🧪 涂层材料体系Coating systems 🏗 防腐工程施工Application works 👷 自有班组 · 不转包In-house crews 📊 全流程检测留档Full QC records
COATING SYSTEMSCOATING SYSTEMS

涂层材料体系Coating Systems

按介质、温度与磨损工况选型——材料对路,防腐耐磨才真正成立。

Selection driven by media, temperature and abrasion — the right system makes protection real.

🧱

重防腐玻璃鳞片体系

Glass-Flake Systems

乙烯基酯/环氧玻璃鳞片胶泥,耐强酸结露与 120℃ 烟气——湿法脱硫烟道、脱硫塔、地坪首选。

Vinyl-ester / epoxy glass-flake linings for acid condensate and 120°C flue gas — FGD ducts, towers, floors.

🛡

耐磨抗冲蚀涂层

Anti-Wear Coatings

陶瓷/高硬粒子增强,抵抗颗粒冲刷——输煤溜槽、灰渣管道、磨机与泵件内衬。

Ceramic-reinforced linings resisting particle erosion — chutes, ash lines, mill and pump internals.

导静电与耐油体系

Antistatic & Oil-Resistant

储油设施内壁导静电防腐,兼耐油品浸泡——油罐、油箱、含油污水设施。

Static-dissipative, oil-immersion-proof linings for tanks and oily-water facilities.

🏗

钢结构长效防腐配套

Steel Long-Life Systems

环氧富锌 + 环氧云铁中间漆 + 聚氨酯/氟碳面漆,C4/C5 腐蚀环境 15 年+ 设计寿命。

Zinc-rich epoxy + mica epoxy + PU/fluorocarbon topcoats — C4/C5 atmospheres, 15+ year design life.

ADHESIVES & PUTTIESADHESIVES & PUTTIES

高分子修补 · 粘接胶系列Adhesives, Putties & Sealants

涂层管大面,胶类管局部——耐磨修补、陶瓷衬里粘接、堵漏与电缆冷补等现场修复材料:膏状可刮涂成型、胶泥可抹涂保护,按工况选型号,室温固化即可回用。

Coatings protect the surfaces; these adhesives and putties fix the spots — on-site materials for pitting, erosion, leaks and ceramic lining, curable at room temperature.

BR-167 防磨修复剂双组份包装

BR-167 高分子纳米复合防磨修复剂(刷涂型耐磨涂层)BR-167 Nano Anti-Wear Repair Coating

双组份 · 可流动膏状 · 灰 / 黑 / 蓝

含超细陶瓷颗粒的双组份修复材料,刷涂/刮涂即得光滑耐磨防腐涂层;既可作耐磨颗粒胶的面胶,也可单独使用。用于水泵叶轮、风机叶轮、壳体、管道、弯头、闸阀的磨损/气蚀/腐蚀修复与预保护。工作温度 -60~220℃,硬度 Shore D 81,25℃ 下 45 分钟操作时限、24 小时完全固化。

Two-part ceramic-particle repair compound — brush or trowel on for a smooth anti-wear coating; use as a top coat over wear putty or on its own. Repairs pumps, fan impellers, casings, pipes, elbows, valves. −60~220°C, Shore D 81, 45-min work time / 24-h cure at 25°C.

泵/风机叶轮壳体·管道·弯头闸阀可作颗粒胶面胶-60~220℃
BR-181 金属快速修补剂 A/B 剂包装

BR-181 金属快速修补剂BR-181 Metal Rapid Repair Putty

双组份 · 金属冷焊修补 · 铝箔袋装

双组份金属冷焊修补材料,配合夹具修复轴颈、壳体、法兰密封面与焊缝缺陷,可带压堵漏;固化后机械加工性能良好——把"停机开盖大修"变成"当班应急修补"。

Two-part cold-weld putty for shafts, housings, flange faces and welds; machinable after cure, sealable under pressure.

轴颈/壳体/法兰带压堵漏固化后可加工
BR-172 高温粘合剂包装

BR-172 高温高分子硅橡胶粘合剂BR-172 High-Temp Silicone Adhesive

单组份 · 室温固化 · 管装

单组份室温固化硅橡胶粘合剂,-60~360℃ 宽温域服役——高温工况耐磨陶瓷片粘接、高温管道密封与负压系统密封一次完成。

One-part RTV silicone adhesive rated −60~360°C — bonds wear ceramics and seals hot pipes and vacuum systems.

-60~360℃陶瓷片粘接高温/负压密封
BR-175 高温复合粘合剂 A/B 剂包装

BR-175 高温复合粘合剂(陶瓷片粘贴胶)BR-175 Ceramic Lining Adhesive

双组份环氧结构胶 · 10kg/套 · 1:1

专为耐磨陶瓷片与金属/陶瓷基材粘接设计的高强度结构胶,耐磨损、耐冲击、耐化学腐蚀——电厂落煤管、煤粉管道、脱硫脱硝烟道的陶瓷衬里与防磨板粘贴工程。

High-strength structural epoxy for bonding wear ceramics to steel and cast iron — chutes, coal pipes and FGD ducts.

陶瓷衬里粘贴落煤管/煤粉管道烟道防磨10kg/套
R-182 快速堵漏胶棒

R-182 高分子快速堵漏胶棒R-182 Quick Leak-Seal Putty Stick

双组份胶泥 · 5 分钟止漏 · 可带压施工

室温快速固化的双组份胶泥,成型不粘手、耐油防水、可带压堵漏——变压器、油箱、油罐、油管与化工法兰泄漏的应急抢修首选。工作 -60~150℃,完全固化约 3 小时。

Fast-cure two-part putty — stops leaks in 5 minutes, even under pressure. Ideal for transformers, tanks, pipes and flanges. −60~150°C, full cure ~3 h.

5 分钟止漏带压施工变压器/油罐/法兰-60~150℃
BR-176 高温复合保护剂磨煤机现场修复

BR-176 高温复合保护剂BR-176 High-Temp Protective Putty

胶泥型 · 抹涂成型 · 高温抗磨修补

抹涂成型的耐磨耐蚀修补防护层(施工厚度约 1.5mm,光滑基面先焊钢网增强)——磨煤机动环、人孔门、煤矿离心机等高温磨损部位就地修复,不拆卸、不更换。

Trowel-applied anti-wear repair layer (~1.5mm) for mill dynamic rings, manholes and coal centrifuges — repaired in place at high temperature.

磨煤机动环/人孔门煤矿离心机约1.5mm抹涂
BR-170 碳化硅耐磨防护剂双组份包装

BR-170 碳化硅耐磨防护剂BR-170 SiC Wear-Resistant Putty

双组份 4:1 · 刮涂成型 · 常温固化

含碳化硅耐磨骨料的双组份防护剂,刮涂成任意形状——修复泥浆泵壳体、叶轮、浆液管道的冲蚀/腐蚀磨损并制备耐磨防腐涂层。工作 -60~250℃,25℃ 完全固化约 24 小时。

SiC-filled two-part putty, trowel into any shape — slurry pump casings, impellers and pipes against erosion. −60~250°C, ~24 h cure.

泥浆泵壳体/叶轮浆液管道刮涂成型-60~250℃
BR-187 电缆阻燃冷补胶铝箔包装

BR-187 高分子电缆阻燃冷补胶BR-187 Flame-Retardant Cable Cold Repair Putty

阻燃聚氨酯 · 快速冷补 · 免加热

针对矿井电缆、船舶电缆等经常弯曲电缆的接头与护套破损,10kV 以下中压接头绝缘及护套的快速冷补修复密封——免加热硫化,常温成型即恢复绝缘与机械防护。

RTV polyurethane cold repair for cable joints and sheaths that flex — mine and marine cables, insulation and sealing up to 10 kV, no heat required.

10kV 以下接头绝缘矿井/船舶电缆护套破损修复阻燃免加热
🧪 试涂选型:每种胶的适用基材与工况不同——设备照片发给我们,技术顾问免费确认配方并寄样试涂,先验证再采购。 Free trials: Send equipment photos — we confirm the grade and ship samples to validate before purchase. 申请试涂 →Request Sample →
APPLICATION WORKSAPPLICATION WORKS

防腐工程服务Application Works

四类典型场景,一套完整打法:诊断 → 选材 → 施工 → 检测 → 巡检。

Four typical scenarios, one complete playbook: diagnose → select → apply → test → inspect.

img

烟囱防腐改造Chimney Retrofit

湿法脱硫后低温酸结露腐蚀的综合治理:玻化砖/发泡玻璃砖内衬、耐酸胶泥砌筑、耐温防腐涂料体系;砖烟囱与钢烟囱均适用。

Solving low-temperature acid corrosion after FGD: glass block linings, acid-resistant mortars and high-temp coatings for brick and steel stacks.

不停炉方案可选 · 内衬寿命 15 年+Optional on-line retrofit · 15+ yr lining life
逐段影像留档,验收数据齐全Full photo & test documentation
img

脱硫塔 / 烟道衬里FGD Tower & Duct Lining

湿法脱硫塔、原/净烟道乙烯基酯玻璃鳞片衬里体系,耐 120℃ 烟气、耐强酸结露与浆液冲刷,焊缝区重点加强。

Vinyl-ester glass-flake lining for wet FGD towers and ducts: 120°C flue gas, acid condensate and slurry erosion resistance, reinforced at welds.

电火花 100% 针孔检测100% spark testing
膜厚逐点记录,可追溯Per-point DFT records
img

储罐内防腐Storage Tank Lining

酸碱储罐玻璃鳞片衬里、油罐导静电涂料、水罐食品级环氧体系;喷砂 Sa2.5 + 电火花 + 附着力全检。

Glass-flake acid lining, antistatic oil-tank coating, potable-water epoxy; Sa2.5 blast, spark and adhesion testing throughout.

介质工况定制选材Media-tailored selection
受限空间作业合规管理Confined-space compliant
img

管道与钢结构防腐Pipeline & Steel Protection

埋地管道 3PE/环氧粉末 + 阴极保护配合;架空与高温管线聚氨酯/环氧配套;厂房钢结构环氧富锌长效体系。

3PE / FBE with cathodic protection for buried lines; PU/epoxy systems for above-ground and steam lines; zinc-rich systems for plant steel.

高温蒸汽管线方案成熟Proven for steam lines
外观与防腐双达标Cosmetic + protective
QUALITY CONTROLQUALITY CONTROL

防腐工程质量控制点Application QC Points

防腐是隐蔽工程——每一道看不见的工序,都要有看得见的记录。

Corrosion work is hidden work — every invisible step deserves a visible record.

工序Step控制要求Requirement
表面处理Surface prep喷砂/抛丸达 Sa2.5,粗糙度 40–75μmSa2.5 blast, 40–75µm profile
环境条件Environment相对湿度 ≤85%,露点以上 3℃ 施工RH≤85%, 3°C above dew point
涂层厚度Film thickness湿膜+干膜逐点测量,90/10 规则判定DFT per point, 90/10 rule
针孔检测Holiday test衬里层 100% 电火花扫描100% spark scan on linings
附着与养护Adhesion & cure拉拔附着力 ≥5MPa,按 TDS 养护Pull-off ≥5MPa, cure per TDS
验收交付Handover检测数据 + 影像 + 材料质保书归档Data, photos & CoA archived
👷

自有班组施工

Own Crews

不转包、不赶工——班组稳定,工艺标准稳定,质量才稳定。

No subcontracting, no rushing — stable crews mean stable quality.

📷

全程影像留档

Photo Records

每道工序拍照+数据记录,隐蔽工程不"隐蔽"。

Every step photographed and logged — hidden work, unhidden records.

🛡

质保与回访

Warranty & Visits

质保承诺 + 定期回访巡检,48h 应急到场。

Warranty plus scheduled inspections and 48h emergency response.

设施在腐蚀?先做一次专业诊断

Corrosion creeping in? Start with a survey

上传现场照片或描述工况,工程师免费评估腐蚀/磨损风险并给出选材建议。

Send photos or describe conditions — engineers assess corrosion/wear risk and recommend systems, free.

免费勘察评估Free Assessment